Article
The lean machine : reductions of up to 75% in turnaround times and averag cost savings of 25% in maintenance have been achieved by the UK's Joint Force Harrier
Titre(s)
- The lean machine : reductions of up to 75% in turnaround times and averag cost savings of 25% in maintenance have been achieved by the UK's Joint Force Harrier
Ensemble
- AEROSPACE INTERNATIONAL n° 10 Vol. 31 03050831 01/10/2004
Auteur(s)
Adresse bibliographique
- 2004
Description matérielle
- 24-27 p. : couleur
Sujet(s)
Lien copié.
Build V.5.2.2 - 2ecb916194 (29/04/2026 07:35:08)