RAPPORT

THE U.S. SUBMARINE PRODUCTION BASE: AN ANALYSIS OF COST, SCHEDULE AND RISK FOR SELECTED FORCE STRUCTURES / J. BIRKLER, J. SCHANK, G. SMITH

  • THE U.S. SUBMARINE PRODUCTION BASE: AN ANALYSIS OF COST, SCHEDULE AND RISK FOR SELECTED FORCE STRUCTURES / J. BIRKLER, J. SCHANK, G. SMITH
  • RAND CORPORATION, 1994
  • 27 p.
  • 0-8330-1587-7
  • RAPP
Lien copié.
Build V.5.2.2 - 2ecb916194 (29/04/2026 07:35:08)